High molecular polyethylene board


When installing the polymer polyethylene board coal bunker lining board, in the case of large changes in operation or ambient temperature, the fixed form of the lining board must consider its free expansion or contraction. For any fixing method, the design should take into account the flow of bulk materials, and the screw head female is always buried in the liner. For thicker linings, the edges should be cut to 45 degrees. In this way, the length is allowed to change, and a smooth plastic plane is formed in the storage bin, which is conducive to the flow of materials.

Special attention when installing polymer polyethylene board coal bunker lining:
1. During the installation, the flat surface of the bolts of the lining board must be lower than the surface of the board;
2. The use of high-molecular-weight polyethylene board coal bunker lining board should not be less than 10 bolts per square meter;
3. The gap between each lining board should not be larger than 0.5cm (adjustment should be made according to the ambient temperature of the board during installation);


online service

Product consultation
点击这里给我发消息
a